Minutes, IBIS Quality Committee 09 May 2006 11-12 AM EST (8-9 AM PST) Phone: 1.877.384.0543 or 1.800.743.7560 Meeting access: Meeting ID: 90437837 ROLL CALL Adam Tambone Barry Katz Benny Lazer Benjamin P Silva *Bob Ross Brian Arsenault *Eckhard Lenski Eric Brock Gregory R Edlund Hazem Hegazy John Figueroa John Angulo Katja Koller Kevin Fisher *Kim Helliwell Lance Wang Lynne Green *Mike LaBonte *Moshiul Haque Peter LaFlamme Robert Haller *Roy Leventhal Sherif Hammad Todd Westerhoff Tom Dagostino Kazuyoshi Shoji Sadahiro Nonoyama Everyone in attendance marked by * NOTE: "AR" = Action Required. -----------------------MINUTES --------------------------- Mike LaBonte conducted the meeting. Review of minutes for 25 Apr 2006: - approved Announcements - EIA Call for Patent Disclosure: - No company declared a patent. AR Review: - Roy review IQ checks to organize for categories - Not complete - Created a series of tables. 1 2 3 IQ level, test type, IBIS sections - Section 1 and section 3 not consistent about whether a complete pin is required or not. - Pin categories: - signals - power & ground - other (vref, etc.) - NC - The 5 quality levels are not clear. - Roy should be able to finish in the next few weeks. - Mike rewrite parser bug and submit. TBD - Mike categorize checks for next discussion AR: Mike rewrite parser bug and submit ASAP. Opens for new items: Continued discussion of IQ level designations: - IQ 2.9 probably could be removed - We don't care if a file has Copyright and Disclaimer - The burden of checks may be too high to have these minor items. - 4.5.2 changed from REQUIREMENT to TEST - change categories to - IQ OPTIONAL - IQ REQUIRED - IBIS REQUIRED - ibischk - non-ibischk (eg. checking voltage range requirements) - IBIS CONDITIONAL - We originally felt LEVEL 0 was passing ibischk - 4.2.1 gets an ibischk warning if missing on inputs - that check should be IBIS REQ - levels should be: 0 - not checked or fails ibischk 1 - passes ibischk 2 - passing basic manual checks - 4.2.6 was a SiSoft request - only needed for Schmidt trigger devices - category of data conditionally required - one-line descriptions are tough to compare - 4.4.5 overlaps 2.8? - IQ spec has 97 checks, too long, - Should we have "checks" that are mere suggestions? - eg. Do not use [Comment Char] - IBIS is ambiguous about the nature of requirements - eg. Pullup is absolutely required AR: Mike update spreadsheet and resend Next meeting: - Try to use online collaboration software to rework IQ "live". AR: Mike and Eckhard test MeetingPlace 23 May 2006 11-12 AM EST (8-9 AM PST) Phone: 1.877.384.0543 or 1.800.743.7560 Meeting access: Meeting ID: 90437837 Meeting ended at 12:08 PM Eastern Time.